Cabin Gas Plant
-
Cabin10
http://fortnelsonreadymix.ca/wp-content/uploads/2013/10/Cabin10.jpgWe started work at EnCana's Cabin Gas Plant in the Horn River Basin from our Vince Hagen portable batch plant to produce concrete in temperatures down to -30 Celsius.
-
Cabin9
http://fortnelsonreadymix.ca/wp-content/uploads/2013/10/Cabin9.jpgWe started work at EnCana's Cabin Gas Plant in the Horn River Basin from our Vince Hagen portable batch plant to produce concrete in temperatures down to -30 Celsius.
-
Cabin8
http://fortnelsonreadymix.ca/wp-content/uploads/2013/10/Cabin8.jpgWe started work at EnCana's Cabin Gas Plant in the Horn River Basin from our Vince Hagen portable batch plant to produce concrete in temperatures down to -30 Celsius.
-
Cabin5
http://fortnelsonreadymix.ca/wp-content/uploads/2013/10/Cabin5.jpgWe started work at EnCana's Cabin Gas Plant in the Horn River Basin from our Vince Hagen portable batch plant to produce concrete in temperatures down to -30 Celsius.
-
Cabin4
http://fortnelsonreadymix.ca/wp-content/uploads/2013/10/Cabin4.jpgWe started work at EnCana's Cabin Gas Plant in the Horn River Basin from our Vince Hagen portable batch plant to produce concrete in temperatures down to -30 Celsius.
-
Cabin3
http://fortnelsonreadymix.ca/wp-content/uploads/2013/10/Cabin3.jpgWe started work at EnCana's Cabin Gas Plant in the Horn River Basin from our Vince Hagen portable batch plant to produce concrete in temperatures down to -30 Celsius.
-
Cabin2
http://fortnelsonreadymix.ca/wp-content/uploads/2013/10/Cabin2.jpgWe started work at EnCana's Cabin Gas Plant in the Horn River Basin from our Vince Hagen portable batch plant to produce concrete in temperatures down to -30 Celsius.
-
Cabin1
http://fortnelsonreadymix.ca/wp-content/uploads/2013/10/Cabin1.jpgWe started work at EnCana's Cabin Gas Plant in the Horn River Basin from our Vince Hagen portable batch plant to produce concrete in temperatures down to -30 Celsius.
-
Cabin01
http://fortnelsonreadymix.ca/wp-content/uploads/2013/10/Cabin01.jpgWe started work at EnCana's Cabin Gas Plant in the Horn River Basin from our Vince Hagen portable batch plant to produce concrete in temperatures down to -30 Celsius.
-
Cabin00
http://fortnelsonreadymix.ca/wp-content/uploads/2013/10/Cabin00.jpgWe started work at EnCana's Cabin Gas Plant in the Horn River Basin from our Vince Hagen portable batch plant to produce concrete in temperatures down to -30 Celsius.
-
QW5
http://fortnelsonreadymix.ca/wp-content/uploads/2013/08/QW5.jpgWe started work at EnCana's Cabin Gas Plant in the Horn River Basin from our Vince Hagen portable batch plant to produce concrete in temperatures down to -30 Celsius.
-
QW4
http://fortnelsonreadymix.ca/wp-content/uploads/2013/08/QW4.jpgWe started work at EnCana's Cabin Gas Plant in the Horn River Basin from our Vince Hagen portable batch plant to produce concrete in temperatures down to -30 Celsius.
-
QW3
http://fortnelsonreadymix.ca/wp-content/uploads/2013/08/QW3.jpgWe started work at EnCana's Cabin Gas Plant in the Horn River Basin from our Vince Hagen portable batch plant to produce concrete in temperatures down to -30 Celsius.
-
QW2
http://fortnelsonreadymix.ca/wp-content/uploads/2013/08/QW2.jpgWe started work at EnCana's Cabin Gas Plant in the Horn River Basin from our Vince Hagen portable batch plant to produce concrete in temperatures down to -30 Celsius.
-
QW1
http://fortnelsonreadymix.ca/wp-content/uploads/2013/08/QW1.jpgWe started work at EnCana's Cabin Gas Plant in the Horn River Basin from our Vince Hagen portable batch plant to produce concrete in temperatures down to -30 Celsius.
-
QW6
http://fortnelsonreadymix.ca/wp-content/uploads/2013/08/QW6.jpgWe started work at EnCana's Cabin Gas Plant in the Horn River Basin from our Vince Hagen portable batch plant to produce concrete in temperatures down to -30 Celsius.
Working with Natural Gas Supplier EnCana on construction of their Cabin Gas Plant, we’ve overcome difficult conditions:
- Remote location 3 hours Northeast of Fort Nelson in the Horn River Basin
- Complex logistics, as all materials must be trucked in on the Sierra-Yoho-Desan Road
- Production in temperatures down to -30 Celsius
The remote location of the job site necessitated precise coordination between our operation and multiple contractors, meeting specific timelines for delivery. Extreme weather not only added a challenge to the setup of our Vince Hagen portable plant, we were also producing concrete in the same 30-below-freezing temperatures. Despite these conditions, we were able to ensure all CSA standards were met. With phases 1 and 2 of EnCana’s natural gas processing plant complete, we are now ready for the next four phases construction.